Open Decision Ledger · Constitutional, administrative & state liability
Prior administrative decision on each compensation item before suing
Supreme Court, Jan. 25, 2024, 2023Du49172 (judgment)
No holding summary · checked against points at issue. The official text publishes no summary of the holding for this decision. The quotation and factors in this record are copied verbatim from the points at issue; the evidence for each axis is taken from the points at issue, the order and the reasons.
Case name: 손실보상금
Official text on the National Law Information Center
Question
May a person who suffered loss on a residual building because part of it was taken for a public works project sue the project operator directly without first going through the administrative decision procedure, even where that procedure was completed for the land taken, and must the procedure be judged item by item?
Holding
No. Under the former Act on the Acquisition of and Compensation for Land etc. for Public Works Projects, an owner seeking compensation for the decrease in the price of the residual building under Article 35(1) of its Enforcement Rule, or for repair costs under Article 35(2), must first go through the administrative decision procedure under Articles 34 and 50 and only then may seek relief under Articles 83 to 85, and a direct suit against the project operator is not allowed, the same being true where the procedure was completed for the land taken. Whether the procedure was completed is judged compensation item by item, and since the two kinds of compensation differ in legal basis, requirements, subject and scope, and valuation method, an objection decision on the price decrease does not cover a claim for repair costs.
Points at issue, verbatim
공익사업에 건축물의 일부가 편입됨에 따라 잔여 건축물에 손실을 입은 자가 재결절차를 거치지 않은 채 곧바로 사업시행자를 상대로 잔여 건축물 가격감소 또는 보수비에 관한 손실보상을 청구할 수 있는지 여부(소극)
Unofficial English translation
Whether a person who has suffered loss to a remaining building as a consequence of part of a building being taken into a public works project may claim compensation for losses, in the form of a diminution in the value of the remaining building or repair costs, directly against the project operator without undergoing the adjudication procedure (negative)
Disposition
Reversed and rendered by the Supreme Court Stated in the decision
원심판결 중 잔여 건축물 보수비에 관한 손실보상청구의 피고 패소 부분을 파기하고, 이 부분 원고들의 소를 각하한다. 소송총비용은 원고들이 부담한다.
Unofficial English translation
The part of the judgment of the court below on the claim for compensation for losses in the form of repair costs of the remaining building in which the defendant lost is reversed, and the plaintiffs' claim in that part is dismissed on procedural grounds. The plaintiffs shall bear the total costs of litigation.
Form of the test
Elements stated Stated in the decision
따라서 잔여 건축물 보수비에 관한 손실보상을 받으려는 건축물 소유자는 잔여 건축물 보수비에 관한 손실보상청구의 소를 제기하기 전에 그에 관한 적법한 재결을 거쳐야 한다.
Unofficial English translation
Accordingly, an owner of a building who intends to receive compensation for losses in the form of repair costs of the remaining building must undergo a lawful adjudication thereon before filing an action seeking compensation for losses in the form of repair costs of the remaining building.
Factors
- 재결절차를 거치지 않은 채 곧바로 사업시행자를 상대로 잔여 건축물 가격감소 또는 보수비에 관한 손실보상을 청구할 수 있는지 여부(소극)
- 이때 재결절차를 거쳤는지는 보상항목별로 판단해야 하는지 여부(적극)
- 공익사업을 위한 토지 등의 취득 및 보상에 관한 법률 시행규칙 제35조 제1항에 따른 잔여 건축물 가격감소에 관한 손실보상에 관한 재결만 받은 이후 제기한 잔여 건축물 가격감소에 관한 손실보상청구의 소에서 같은 조 제2항에 따른 잔여 건축물 보수비에 관한 손실보상청구를 구할 수 있는지 여부(소극)
Unofficial English translation
• Whether compensation for losses, in the form of a diminution in the value of the remaining building or repair costs, may be claimed directly against the project operator without undergoing the adjudication procedure (negative)
• Whether, in that case, it must be determined for each item of compensation whether the adjudication procedure has been undergone (affirmative)
• Whether, in an action seeking compensation for losses in the form of a diminution in the value of the remaining building filed after obtaining only an adjudication on compensation for losses in the form of a diminution in the value of the remaining building under Article 35 (1) of the Enforcement Rule of the Act on Expropriation of Land, etc. for Public Works and Compensation Therefor, a claim for compensation for losses in the form of repair costs of the remaining building under paragraph (2) of the same Article may be asserted (negative)
Relation to precedent
Follows earlier decisions Stated in the decision
대법원 2018. 6. 15. 선고 2018두35681 판결, 대법원 2018. 7. 20. 선고 2015두4044 판결 등 참조
Unofficial English translation
See, among others, Supreme Court Decision 2018Du35681 decided June 15, 2018; Supreme Court Decision 2015Du4044 decided July 20, 2018, etc.
Decisions referred to
[1] 대법원 2018. 5. 15. 선고 2017두41221 판결(공2018상, 1088), 대법원 2018. 6. 15. 선고 2018두35681 판결, 대법원 2018. 7. 20. 선고 2015두4044 판결(공2018하, 1775)
Burden of proof
Not addressed Not in the decision
Open question and revisit condition
If an objection decision mentions repair costs only in passing without examining them, has the owner completed the decision procedure for that compensation item?
A later decision on how far an objection application must address repair costs before that item counts as decided would show how the item-by-item test works in practice. Any amendment to Article 35 of the Enforcement Rule, to Articles 34, 50 or 83 to 85 of the Act, or the provisions that succeeded the former Act after 10 August 2021, calls for this entry to be read again.
Cross-family AI independent reading & axis check
7 of 8 axes matched GPT-6 Astra (OpenAI, codex CLI) · 2026-10-26
A reader from another model family (GPT-6 Astra), given the official text but not the primary reading, agreed on 7 of the 8 axes; the readings differed on axis 8 (open question and revisit condition).
Axis 8 (Open question and revisit condition): Primary “If an objection decision mentions repair costs only in passing without examining them, has the owner completed the decision procedure for that compensation item?” vs Independent “How should diminished-value compensation and repair-cost compensation be coordinated to avoid duplicate recovery when both have undergone proper adjudication?”
The primary asks whether a passing mention of repair costs counts as completion of the procedure, while the independent asks how to adjust two properly adjudicated awards to avoid duplication.
공익사업에 건축물의 일부가 편입됨에 따라 잔여 건축물에 손실을 입은 자가 재결절차를 거치지 않은 채 곧바로 사업시행자를 상대로 잔여 건축물 가격감소 또는 보수비에 관한 손실보상을 청구할 수 있는지 여부(소극)Raw responses and comparison record: Protocol · Blind readings (JSONL) · Axis comparison (JSONL) · SHA-256 (JSON)
Lower-court contrast & scope of application
Lower-court reading vs. Supreme Court holding
Lower-court context: The Seoul High Court, in its judgment of 5 July 2023 (2021Nu50262), did not dismiss the plaintiffs' claim for compensation for the repair of the residual building. The plaintiffs had added that claim during the proceedings below, after their objection application against the compensation for the decrease in the price of the residual building had been refused, and the court below went on to the merits and granted part of it.
Supreme Court standard: The Supreme Court held that the repair-cost claim was a different compensation item from the price-decrease claim and a new claim not covered by the objection decision, so it had not been through a lawful decision procedure and was inadmissible. It found that the court below had misread the law on compensation items, on the relationship between the two kinds of residual-building compensation and on the requirements of a compensation increase or decrease suit, and reversed only that part of the judgment, dismissing the plaintiffs' repair-cost claim and placing the whole costs on them.
Distinguishing conditions
- A suit in which the owner has first obtained a lawful administrative decision on compensation for the repair of the residual building under Article 35(2) of the Enforcement Rule.
- A claim confined to the decrease in the price of the residual building, for which the objection procedure has been completed, since the Court's rule turns on which item the claim concerns.
- A case governed by the Act as amended on 10 August 2021 (Act No. 18386), since the Court applied the former version of the Act.
Record verification notes
Identify first which compensation item the claim rests on, price decrease under Article 35(1) of the Enforcement Rule or repair costs under Article 35(2). Then set each item against the decision actually obtained, because the Court judged the decision procedure item by item and an objection decision on price decrease did not reach repair costs. Finally, confirm which version of the Land Compensation Act was in force when the decision was applied for.
From the official text
Points at issue
[1] 공익사업에 건축물의 일부가 편입됨에 따라 잔여 건축물에 손실을 입은 자가 재결절차를 거치지 않은 채 곧바로 사업시행자를 상대로 잔여 건축물 가격감소 또는 보수비에 관한 손실보상을 청구할 수 있는지 여부(소극) 및 이는 수용대상토지에 대하여 재결절차를 거친 경우에도 마찬가지인지 여부(적극) / 이때 재결절차를 거쳤는지는 보상항목별로 판단해야 하는지 여부(적극) [2] 공익사업을 위한 토지 등의 취득 및 보상에 관한 법률 시행규칙 제35조 제1항에 따른 잔여 건축물 가격감소에 관한 손실보상에 관한 재결만 받은 이후 제기한 잔여 건축물 가격감소에 관한 손실보상청구의 소에서 같은 조 제2항에 따른 잔여 건축물 보수비에 관한 손실보상청구를 구할 수 있는지 여부(소극)
Unofficial English translation
[1] Whether a person who has suffered loss to a remaining building as a consequence of part of a building being taken into a public works project may claim compensation for losses, in the form of a diminution in the value of the remaining building or repair costs, directly against the project operator without undergoing the adjudication procedure (negative), and whether the same applies even where the adjudication procedure has been undergone with respect to the land subject to expropriation (affirmative) / Whether, in that case, it must be determined for each item of compensation whether the adjudication procedure has been undergone (affirmative) [2] Whether, in an action seeking compensation for losses in the form of a diminution in the value of the remaining building filed after obtaining only an adjudication on compensation for losses in the form of a diminution in the value of the remaining building under Article 35 (1) of the Enforcement Rule of the Act on Expropriation of Land, etc. for Public Works and Compensation Therefor, a claim for compensation for losses in the form of repair costs of the remaining building under paragraph (2) of the same Article may be asserted (negative)
Summary of the holding
The official text publishes no summary of the holding for this decision. The quotation and factors in this record are copied verbatim from the points at issue; the evidence for each axis is taken from the points at issue, the order and the reasons.
Order
원심판결 중 잔여 건축물 보수비에 관한 손실보상청구의 피고 패소 부분을 파기하고, 이 부분 원고들의 소를 각하한다. 소송총비용은 원고들이 부담한다.
Unofficial English translation
The part of the judgment of the court below on the claim for compensation for losses in the form of repair costs of the remaining building in which the defendant lost is reversed, and the plaintiffs' claim in that part is dismissed on procedural grounds. The plaintiffs shall bear the total costs of litigation.
Provisions referred to
[1] 구 공익사업을 위한 토지 등의 취득 및 보상에 관한 법률(2021. 8. 10. 법률 제18386호로 개정되기 전의 것) 제26조, 제28조, 제30조, 제34조, 제50조, 제61조, 제75조의2, 제83조, 제84조, 제85조, 공익사업을 위한 토지 등의 취득 및 보상에 관한 법률 시행규칙 제35조 [2] 구 공익사업을 위한 토지 등의 취득 및 보상에 관한 법률(2021. 8. 10. 법률 제18386호로 개정되기 전의 것) 제26조, 제28조, 제30조, 제34조, 제50조, 제61조, 제75조의2, 제83조, 제84조, 제85조, 공익사업을 위한 토지 등의 취득 및 보상에 관한 법률 시행규칙 제35조
Read 2026-10-26 · Cross-read 2026-10-26. All quotes matched against the official text. The Chinese-character placeholders the court used for anonymised parties are given in their Korean readings, and parenthetical Chinese-character glosses are omitted.
Every entry is published only after all quotes have been matched character by character against the official text, and audited by an independent second reading from a different model family across all eight axes. Both agreed axes and text-grounded interpretive divergences are recorded openly. The ledger is a research record, not an assessment of the court or advice on any matter.